Replication Station → S.H.O. Drive Mark I
S.H.O. Drive Mark I will be the world's first S.H.O. drive. Come back in the next couple months for major updates! S.H.O. talk 21:35, 5 May 2016 (PDT)
S.H.O. Drive Mark Alpha refers to the original plan for world's first S.H.O. Drive. The actual build will incorporate clear acrylic tubes to elevate the wooden panels inside the crate for maximum transparency and minimization of the ways to hide batteries. A build and demonstration was planned for the 4th of July, but I decided that more planning was need in terms of the logistics of the demonstration as well as the final shape of the S.H.O. Coils. The build time to make the S.H.O. Drive is, and I estimate, to be around 5 hours. Since the video showing the build must be done in one take, I have to make sure that I have my ideas lined up, so this way they come out smoothly in the presentation. Also, cost information is not listed for S.H.O. Drive Alpha because it is preliminary work, but when the world's first S.H.O. drive is built, the cost information for that build will be made available. Sincerely, S.H.O. talk 20:06, 4 July 2016 (PDT)
Contents
Presentation Outline (for S.H.O. Drive Alpha)
Build Gallery
Dimensions
Distance along shaft length (Depth)
For design plan as of August 28, 2016 inches 1 7/8 back end assembly behind panel 5/8 square acrylic support rod 1/2 acrylic panel 1 1/4 vinyl cup hooks 1/4 air gap 1 1/2 neo magnets 1/4 air gap 1 1/4 vinyl cup hooks 1/2 acrylic panel 5/8 square acrylic support rod 3 3/8 front end assembly in front of panel 12 total length of shaft
April 2016 Presentation
I | Introduction Summary of measuring devices, back up and safety equipment, and camcorder (+accessories) |
---|
1 | Phase 1 Holes, brass hinges, square nuts |
---|
2 | Phase 2 Neodymium magnets and bearings |
---|
3 | Phase 3 Spool, coils, and ceiling hooks |
---|
4 | Phase 4 No hidden batteries, increase rigidity, hex nuts, terminal rings, toggle switch, fan blades, and extended test run |
---|
5 | Phase 5 Heavy duty basket, S.H.O. Drive insertion, secure meters, and portable extended test run |
---|
6 | Phase 6 Square tote, plastic spools, protective edge trim, and enclosed extended test run |
---|
7 | Phase 7 Prepare elevated test platform, outdoor test setup, camcorder hookup to portable power, and outdoor extended test run |
---|